iyibir
SolutionsAIProductsServicesCompanyResourcesContactGet Consulting
Resources

Guides that make your Logo and ERP decisions easier.

Practical content drawn from our field experience — from product selection and e-Transformation to warehouse operations and user training.

e-Transformation

Basic or commercial? Choosing an e-Invoice scenario and its consequences

The most confused decision when issuing an e-Invoice: basic or commercial? The only practical difference between the two scenarios is whether the recipient can reject the invoice through the system. We explain which one to choose, with examples.

Read article
AI

AI and Logo ERP for businesses: Where to start?

There is no need to collect separate data for AI — the sales, inventory, finance, and production data already accumulated in Logo ERP can start generating decisions and forecasts with the right architecture. A practical starting guide.

Read article
ERP

The importance of ERP for businesses: What does it really add to a company?

What is ERP, how does it consolidate a company's scattered processes onto a single backbone, and what concrete outcomes does it produce? We explain the value ERP brings to a business — from sales to production, finance to the warehouse.

Read article
Logo ERP

What to consider when choosing Logo ERP?

How to evaluate business scale, module requirements, and growth plans when deciding between Logo Tiger and Logo GO?

Read article
e-Transformation

The right transition plan for e-Transformation processes

Common mistakes when transitioning to e-Invoice and e-Ledger, and how to build a controlled transition plan that does not disrupt operations.

Read article
iyibir WMS

The impact of WMS on warehouse operations

What changes in inventory accuracy and shipping speed when barcode, shelf, and mobile counting processes are connected to ERP?

Read article
Training

The impact of Logo training on ERP success

Why is user competency the most critical yet most overlooked component of ERP projects?

Read article
Logo ERP

Logo GO or Logo Tiger? How to choose the right ERP

You've decided to go with Logo, but it's unclear which product — GO or Tiger — fits your business. Here are the criteria for deciding, based on scale, process complexity, and growth plans.

Read article
Logo ERP

What does an Authorized Logo Dealer actually do?

You can't buy a Logo license directly from the manufacturer — it's sold exclusively through the authorized dealer and partner network. What does a dealer actually do beyond selling the license, what separates a dealer from a solution partner, and why is that choice more lasting than the license itself?

Read article
Logo ERP

What happens to your Logo license when you switch dealers?

If you switch Logo dealers, does your license get cancelled, does your data disappear, do you pay again? We explain how the Logo license technically works, what changes and what doesn't when you switch dealers, and what to check before making a decision.

Read article
Logo ERP

What is a Logo ERP support agreement, and what does it cover?

Even with an up-to-date LEM membership, someone still has to install that update and resolve your issue. We explain how a Logo ERP support agreement differs from LEM, what it covers, and what to look for before signing one.

Read article
Technical Support

Why does your Logo software slow down? Causes and what you can do

If your Logo GO or Logo Tiger installation has slowed down over time, there is rarely a single cause: the database, server, network, usage habits, data quality, and version can all play a part. We explain the checks you can run yourself and when it's time to call in an expert.

Read article
Technical Support

Logo software won't open or shows a connection error: what to check first

If Logo GO or Logo Tiger won't open in the morning, or shows a “connection could not be established” error, there is one question to ask before anything else: is this happening to everyone, or just one user? That single question splits the likely causes in two. We walk through what to check in the first few minutes and what to have ready before opening a support request.

Read article
Technical Support

What to do before updating your Logo ERP

Postponing a Logo update carries risk — but so does rushing into one. A practical, actionable checklist for what to check, what to list, and when not to update.

Read article
Logo ERP

How to migrate from Logo GO to Logo Tiger

You're running Logo GO and your business has grown; you're considering a move to Tiger. The real question: does your data carry over, what needs rebuilding, and what stages does the process go through?

Read article
Reporting

Business intelligence and management reporting in Logo ERP: The data is there, so why isn't the report?

Data has been entered into the ERP for years, yet the number that reaches the management meeting is still a table someone stitched together in Excel late at night. The problem usually isn't missing data — it's that the operational report the ERP produces and the decision-oriented report management actually needs have been treated as the same thing.

Read article

If you couldn't find the topic you were looking for, let us know and we'll consider your content suggestion.

Get in touch